Gabriel Lima

Mechanical Engineering · UCF

Gabriel Lima

Pick a star or scroll
Mechanical Engineering / Robotics & Space SystemsOrlando, FL

Building autonomous race cars, robots & rocket payload hardware.

Mechanical engineering student at the University of Central Florida, minoring in Intelligent Robotic Systems. SolidWorks CSWA certified.

Open to robotics, autonomy & aerospace internships gabelima007@gmail.com
Portrait of Gabriel Lima
02  About

About

I'm a Mechanical Engineering student at UCF, minoring in Intelligent Robotic Systems.

Right now I'm an Autonomous Driving Research Assistant at the CAVREL Lab, developing and testing ROS 2 autonomy software on 1/10-scale F1TENTH race vehicles. I've built and serviced five of them, and tuning their suspension cut our average collision rate by 23%.

I'm also the Mechanical Workshop Lead for AI Racer, UCF's autonomous racing initiative, where I'm building a mechanical curriculum to help students go from a bare chassis to a race-ready autonomous car. I competed in our AI Racer Grand Prix in 2026, and my team took 1st place.

On the space side, I'm the Lead Test Engineer for an IREC 2027 rocket payload. I set the flight-derived test levels and pass/fail criteria, design low-cost test rigs like a centrifuge and a guided drop rig, and back each test procedure with hand calculations.

I'm CSWA certified in SolidWorks, and I'm comfortable taking a part from CAD to a 3D print to a working system on the bench. I speak English, Portuguese, and some Spanish.

Outside of engineering, I love going out hiking, playing soccer and training combat sports like wrestling, kickboxing and BJJ. I also like to play video games, and I love talking with and meeting new people.

I'm looking for internships in robotics and space systems. If you're working on autonomy, aerospace hardware, or test engineering, I'd love to connect.

03  Selected workSix builds · 2026
01  Mechanical / Electrical Engineer · Team SHPE UCFJan – May 2026
Team SHPE UCF, Grand Prix winners
Team SHPE UCF, Grand Prix winners

AI RacerGrand Prix · 1st place

A small-scale autonomous F1-style car running a Linux, ROS 2 driving stack. Our team worked across mechanical, electrical and software groups and won UCF's AI Racer Grand Prix with a record top speed.

8 → 10 m/s

Top speed after removing the rear wing and downsizing the chassis to cut dead weight and battery strain.

CAD → ABS

Modeled the chassis, suspension, steering, wings and bumper in SolidWorks, then prototyped and printed them in ABS.

Pi 4 + LiDAR

Compact mounts for the Raspberry Pi 4 and RPLIDAR inside competition size limits; wired and soldered the electronics.

02  Research Assistant · CAVREL Lab, UCFOct 2026 – Now
Autonomous lap on the lab's duct-lined track

Self-DrivingAutonomous driving research on F1TENTH cars

Developing and testing ROS 2 autonomy software on 1/10-scale F1TENTH race vehicles for local and international autonomous racing competitions.

180°

Heading flip traced to a sign bug in the VESC driver's Ackermann model. Fixed it and restored accurate odometry for SLAM.

4 m/s

Tuned a gap-following controller (gain, smoothing, saturation, look-ahead) to hold sharp S-turns and wide turns.

−23%

Average collision rate after suspension tuning; diagnosed VESC, power board and LiDAR faults.

03  Lead Test Engineer · RocketSHPE (SHPE UCF × Knights Experimental Rocketry)Sep 2026 – Now
Payload assembly · CAD
Payload assembly · CAD

IREC Payload2027 rocket payload test campaign

A multi-sensor payload that logs pressure, temperature and acceleration through flight and checks whether a student-designed vibration-isolation mount protects its data. I lead environmental testing: what the payload must survive, the procedures, and low-cost rigs to prove it, coordinating with the mechanical, electrical and software leads.

31 g

Sustained-load level, from about 25 g at boost plus margin.

150°F

Thermal soak for a June launch in Midland, TX.

26.5 kPa

Vacuum level for apogee near 32,780 ft.

~$150

Centrifuge and guided drop rig together, instead of renting lab equipment.

03-A  IREC PayloadEvery level traces to a flight condition

Test matrix

The launch site in Midland, TX in mid-June, a predicted apogee near 32,780 ft, and the loads from boost, burnout, deployment and landing. Each level carries margin above flight, and every test has a written pass/fail rule before it runs.

01 Sustained g31 g
Driver
Boost, about 25 g
Method
Centrifuge, payload powered and logging
Pass if
Nothing moves or cracks; no resets, SD errors or data gaps
02 Shock2 cm ↑
Driver
Burnout, deployment, landing
Method
Guided drop on a carriage; height sets peak g, pad sets pulse; every axis
Pass if
Nothing shifts or unseats, especially the SD card
03 Structurem × g
Driver
Full boost load on sled, plates, mounts
Method
Static weights, 60 s hold, then flipped; spares stepped ~10% to failure
Pass if
No cracks, permanent bending or loose fasteners
04 Thermal150°F
Driver
92–95°F ambient plus airframe heating
Method
Oven soak 120 → 135 → 150°F, 1 hr each; load PETG mounts hot
Pass if
Mounts hold shape; Teensy, battery and SD stay in limits
05 Pressure26.5 kPa
Driver
Apogee near 32,780 ft
Method
Vacuum canister in steps against a reference barometer
Pass if
Both MS5611s match; vents keep up; housing intact
06 Power & data1 flight
Driver
Full mission on one battery
Method
Endurance, brownout and reset tests; numbered samples checked by script
Pass if
Logging starts at launch, survives resets, loses nothing
03-B  IREC PayloadBuilt from parts we can buy or borrow

Low-cost rigs

A student budget rules out renting a centrifuge, shaker or thermal-vacuum chamber.

Centrifuge. Spinning the payload on an arm makes the outward pull act like boost. With a 0.25 m arm, 31 g sets the speed:

ω = 333 rpm × 2π / 60 = 34.9 rad/s
a = ω²r = 34.9² × 0.25 = 304 m/s² = 31.0 g

12 V gear motor, bearing shaft, counterweight, plywood enclosure: $85–115.

Guided drop. Height sets the peak; pad stiffness sets the pulse length. A 2 cm start is about a 20 g, 5 ms pulse, so the test starts gentle and steps up. $15–50.

plywood enclosure 12 V gear motor bearing shaft test item counterweight r = 0.25 m 333 rpm → 31 g
Centrifuge layout and the numbers behind it
carriage + item h sets peak g pad sets pulse length start at 2 cm, step up, repeat on every axis
Guided drop rig
03-C  IREC PayloadVent sizing

Pressure & vent test

The payload finds altitude from two barometers inside a sealed housing, so the air inside has to keep up with the air outside on a fast climb. If the vents are too small, readings lag and the housing takes a load it wasn't designed for.

The powered payload and a phone barometer go in a vacuum canister and pump down through three flight points. At each one, the two MS5611 readings are averaged over 30 s and compared. At mid-range, a quick valve release measures vent lag directly.

0 35 70 105 pressure (kPa) 0 ft 17k ft 34k ft altitude Orlando 101.3 Midland ground 91.6 mid-flight ~60 (≈14k ft) apogee 26.5 kPa · 32,780 ft
Vacuum test points along the flight profile
1 91.6 kPaMidland ground level

2,780 ft. Baseline against the reference.

2 ~60 kPaMid-flight

Quick-release vent-lag test happens here.

3 26.5 kPaApogee

About 32,780 ft. Both sensors must agree.

4 ReturnSlow repressurize

Functional check and the data-gap script.

03-D  IREC PayloadFlight & system
Flight sim: altitude, Mach, g
Flight sim: altitude, Mach, g
Prototype system block diagram
Prototype system block diagram
Flight profile
Flight profile

32,780 ft

Predicted apogee. Teensy 4.1, dual KX134 high-g accelerometers, dual MS5611 barometers and microSD logging all get tested against these flight numbers.

04  Mechanical Engineer · Project STRIDE, UCF STEEL · Tail, claws & chassisSep 2026 – Now
Running live at the STEEL showcase

ScorpionRobotic hexapod · Project STRIDE

A servo-driven hexapod built as a scorpion, so the claws and tail add moving parts beyond a basic walker. On a team of seven I designed the tail, the claws, the second-story deck and parts of the front body in SolidWorks, all printed in PETG, and we presented it to industry judges at the UCF STEEL Fall 2026 showcase.

−52%

Tail holding torque (4.37 → 2.1 kg·cm) from moment calcs that set its resting pose inside the MG996R's rating.

2.69 SF

Safety factor in a three-leg tripod stance for a 5.3 lb robot; power budgeted for 315 W peak on a 6 V rail.

RPN 32 → 8

18-mode FMEA; the six highest risks cut with mechanical stops, a watchdog, output gating and fused power.

04  ScorpionTeam assembly model · SolidWorks

Loading model

Put it
together

Click the model, then scroll to assemble it. Drag to spin it. My parts: the tail and stinger, the claws, the second-story deck and the front body.

ExplodedClick the model to control it
04-A  ScorpionTail design

Why the tail curls

Problem

A 20 in tail held out straight puts 4.37 kg·cm on its base servo. The MG996R is rated for about 2.5–3.0 kg·cm continuous, so a straight tail would overheat and sag over a demo.

I broke the tail into short PETG segments so it could curl. Running the moment calculation for each pose showed that arching it up into an S-curve moves its center of gravity back over the body. The lever arm drops by more than half and the holding torque falls to 2.1 kg·cm, inside the servo's continuous range.

center of gravity body long lever arm STRAIGHT · 4.37 kg·cm over the servo's2.5–3.0 rating body short arm CURLED · 2.1 kg·cm 52% less torque,inside the rating
Center of gravity moves to the body side of the servo
Final tail
Final tail
Raised
Raised
A SegmentsFirst segmented tail

Base and linked segments in SolidWorks to prove the range of motion.

B RemodelNew links and stinger

Two- and three-segment links, a stinger end, and platforms that mount the tail to the body.

C ChainChain-link trial, dropped

Servo-driven chain links with guide wheels. The small links fractured under load.

✓ FinalBack to segments

The built robot runs the Rev B segmented tail, which carries the load without cracking.

04-A  ScorpionTail, from CAD to bench
Tail test on the bench
Rev A tail assembly
Rev A tail assembly
Print setup
Print setup
Segment link
Segment link
Stinger end
Stinger end
Tail servo platform
Tail servo platform
Rev C chain link · dropped
Rev C chain link · dropped
04-B  ScorpionChassis design

Two-story chassis

Problem

Nineteen-plus servos, two driver boards, an ESP32, a buck converter and a LiPo all have to fit in a scorpion-shaped body that still carries a 5.3 lb robot on three legs.

The main body holds the leg servos in pockets along each side. The second-story deck I designed sits above it and carries the servo driver board and the tail servo, so the legs are driven from above with short wire runs. I also designed parts of the front body, where the claws mount.

Main body
Main body
Deck V3
Deck V3
Deck V4
Deck V4
01 FrontFront body and claws

Sections of the front body and the claws that mount to it.

02 Deck V3Second-story plate

Cutouts and mounting holes for the driver boards and wiring.

03 Deck V4Organized wiring

Dedicated wire slots, plus mounts for the servo board and tail servo.

04-B  ScorpionBody & claws
Front body, built
Front body, built
Head and claw · CAD
Head and claw · CAD
Body and decks
Body and decks
Claw mount
Claw mount
Claw V3: base and moving jaw
Claw V3: base and moving jaw
Body + tail
Body + tail
Shell panels
Shell panels
05  Mission Designer · Florida Space Institute CubeSat WorkshopJun. – Aug. 2026
Florida Atlantic & Gulf coastline · sargassum blooms laser crosslink 0.6–1 Gbps RF downlink OBSERVATION ×3 RELAY ×3 ground
Image, crosslink, downlink

S.A.I.L.Sargassum Analysis & Inter-satellite Laser

A CubeSat constellation designed with two teammates for the Florida Department of Environmental Protection. It demonstrates laser crosslinks between small satellites, using live sargassum bloom imagery along Florida's coasts as the data being moved.

6 × 6U

CubeSats moving data at 0.6–1 Gbps over a 100–120 day mission.

16–20 dB

S-band downlink margin against a 6 dB requirement.

< 7 kg

Both satellite types, including 25% contingency.

$4–8M

Program budget, plus CONOPS, modes and commissioning checkpoints.

05-A  S.A.I.L.Mission design

Two kinds of satellite

Need

FDEP wants a cheap way to move large volumes of coastline data. The constellation proves laser crosslinks can do it.

Observation sats point at the coast during an imaging window, store images and health data, then crosslink to a visible relay. Radio sats catch the crosslink, log how it performed and downlink everything over X-band.

Safe mode kicks in below 30% battery. The laser runs in three phases: 5 minutes to acquire and track, 120 s at 35 W moving about 12 GB, then 30 s to power down.

Observation sat · 6U
Observation sat · 6U
Observation CONOPS
Observation CONOPS
Modes &amp; fault handling
Modes & fault handling
Timeline &amp; checkpoints
Timeline & checkpoints
Min 4 satsMinimum success

At least 4 deployed and in contact; a stable crosslink moving 2 GB a day; link metrics to the ground.

Full 6 satsFull success

All 6 hold the crosslink all mission at 4 GB+; regular bloom data; 90% of daily downlinks succeed.

T 2026–29Schedule

Start Nov 2026, launch by May 2028, six months of operations, data to the customer by spring 2029.

05-B  S.A.I.L.Checked against a budget before it went in

Engineering budgets

16–20 dBDownlink margin

vs. 6 dB required · S-band 2.23 GHz, 1 W, 1 Mbps, 450 km orbit, 5 m dish

0.006°Pointing error

About 66 m at 600 km, well inside the SCOT20's ±1° steering mirror

6.78 / 6.96 kgMass

Observation / radio sat with 25% contingency, under the 6U limit

25.2 WPower

Recovered in Standby from dual arrays into a 100 Wh battery; laser peaks at 35 W

24 hrStorage

Simulated orbit by orbit so storage fills between passes and clears at each downlink

$4–8MProgram cost

Six 6U CubeSats with launch, ground network time and laser terminals

Storage budget, one day
Storage budget, one day
Battery capacity by mode
Battery capacity by mode
06  Participant · SMART 2026 Semiconductor Manufacturing Workshop, UCFMay – Jul. 2026
Patterned wafer under the cleanroom's yellow light
Patterned wafer under the cleanroom's yellow light

SMART 2026Building a Schottky diode in the cleanroom

A UCF semiconductor manufacturing workshop, supported by L3Harris and Intel, where I took a Schottky diode from a bare silicon wafer to a packaged, tested device. Lectures, lab visits and invited talks ran alongside hands-on work in UCF's ENG1 cleanrooms, and I earned the workshop certificate.

Wafer → chip

Designed the mask, patterned and etched the wafer, sputtered the contacts, then bonded the die into a package.

6 mm

Dies on a 100 mm wafer with 200 µm scribe lines, drawn in KLayout.

Cr/Al/Cr/Au

Contact stack deposited by DC sputtering at 200 W and 4 mTorr.

±500 mV

I-V sweep on a probe station with a Keithley source meter to prove the diode works.

06-A  SMART 2026Eight steps, one device

From bare wafer to working diode

Every step performed by hand in the cleanroom with a small team.

The yellow light keeps the photoresist from being exposed by accident. After patterning, the wafer went through etching and metal deposition, then each die was tested, inspected and packaged.

DC sputtering system
DC sputtering system
Optical profiler measurement
Optical profiler measurement
Inspecting a wafer
Inspecting a wafer
01 MaskKLayout design

6 mm dies and 200 µm scribe lines, saved as GDS.

02 CleanSolvent clean

Acetone and IPA rinse, then a nitrogen dry.

03 CoatAZ 10XT photoresist

Spin coating, plus ultrasonic spray coating from a G-code path.

04 ExposeDirect-write laser

Heidelberg DWL 66+ at 405 nm, then developed in AZ 400K.

05 EtchBOE and TMAH

Buffered oxide etch for SiO2, 85°C TMAH to micromachine silicon.

06 DepositDC sputtering

Cr, Al, Cr and Au contacts at 200 W and 4 mTorr.

07 TestI-V and imaging

Keithley probe-station sweep, Keyence optical profiler and SEM.

08 PackageGold wire bonding

Die attached with silver paste and gold ball bonded into a package.

06  Leadership & trainingClubs & teaching

Leadership

AI Racer

Mechanical Workshop Lead · Oct 2026 – Now

I co-chair the Workshops & Technical Committee for UCF's autonomous racing club. This spring I'm building the mechanical curriculum: chassis assembly, suspension and steering, sensor mounting and 3D printing, so new students can take a bare chassis to a race-ready autonomous car.

I work with the software and electrical leads so all three tracks build toward the same 1/10-scale car, take stock of our hardware and spares, and work with the treasurer to source equipment for workshops and Grand Prix teams.

SHPE UCF

Project Planning Director · Jun. – Aug. 2026

I planned the timelines for the chapter's workshop series and its competition schedule, so projects had clear milestones from kickoff to competition day.

I organized and budgeted a five-week SolidWorks workshop series that prepared members for the CSWA certification, and worked with the other directors on the executive board to keep chapter events, workshops and competition plans on schedule.